Kitchens and bathrooms
Plan a complex renovation before fixtures and finishes are ordered.
Map the existing space
Document dimensions, access, plumbing, electrical, ventilation, and structural constraints. Decide whether the project changes the layout or finishes only.
Set decision dates
Cabinetry, counters, tile, fixtures, and appliances affect one another. Record who approves dimensions, lead times, and final selections before orders are placed.
Protect wet areas
Ask the qualified team how water will be managed at showers, tubs, sinks, and exterior openings. Confirm inspection and test requirements before surfaces are closed.
Prepare for disruption
Discuss temporary facilities, dust protection, delivery access, and the order in which trades return. A clear sequence limits downtime and rework.
Project checklist
- Map existing systems and dimensions.
- Set selection and order dates.
- Coordinate waterproofing and inspections.