Construction guide

Prepare for a renovation

Existing buildings bring useful character and hidden conditions into the same project.

Document what exists

Photograph each affected room and gather past plans, permits, and maintenance records if available. Check for water damage, movement, aging systems, and conditions that might change the scope.

Plan for daily life

Discuss occupancy, work hours, dust protection, temporary utilities, pets, deliveries, and security. Write down the agreed arrangements.

Allow for discoveries

Agree how the team will pause, document concealed conditions, price a change, and obtain approval before extra work proceeds.

Keep records

Photograph concealed work before it is covered. Save product choices, revised drawings, permits, and warranty documents with the final project file.

Project checklist

  • Photograph existing conditions before demolition.
  • Agree on occupied-space protection and work hours.
  • Define a written process for hidden conditions.
  • Save locations and photographs of concealed systems.

Questions to ask

  • What happens if a concealed condition is found?
  • How are occupied areas protected?
  • Which existing systems may need upgrades?
Verify locally: Permit rules, licensing, contracts, and inspections depend on your location. Confirm current requirements with the relevant public office and qualified professionals.